The Old Bakehouse pool extension — timber-clad gable, standing-seam zinc roof, warm Iroko soffit, and full-height glazing onto the terrace

Accessible residential extension · Haresfield, Gloucestershire

Designed for one person. Built for a family.

The brief was a swimming pool. The real brief was Emily — a young woman for whom water is therapy, freedom, and joy. The challenge was to design something clinical enough to meet her needs, beautiful enough to feel like a spa, and generous enough for the whole family to love.

Type

Accessible residential extension — indoor swimming pool

Role

Lead designer · planning · project management · build coordination

Scope

Removal of dilapidated conservatory; new pool hall, changing, shower & WC

Materials

Timber cladding · zinc roof · blue mosaic pool · herringbone limestone · Iroko · exposed steel

The brief

Every day should feel like a spa day.

Emily has cerebral palsy. She is 23 years old, and swimming — the specific conditions of being in water — provides therapeutic advantages that no other activity can replicate. At this stage of young adulthood, maintaining mobility and preventing long-term joint strain are genuine, daily priorities. Her parents came to me as a project manager to oversee the construction of a pool extension. The design documentation was already prepared.

I looked at those documents and saw a missed opportunity.

The existing scheme would have delivered a pool. What it wouldn’t have delivered — and what it needed to deliver — was a space that felt like Emily’s own. The instinct on these kinds of projects is to lean toward the clinical: accessible equipment, robust materials, functional specification. Those things matter. But they shouldn’t define the atmosphere. The objective was clear: every day Emily used that pool should feel like a spa day.

The family had two sons as well. The pool had to work for everyone — for swimming lengths, for family afternoons, for guests. And it had to stand as a piece of architecture in its own right: contemporary, carefully made, and in harmony with the original red brick house it was joining. I redesigned the scheme and took it through planning from scratch.

The response

Clinical enough. Beautiful enough. Open enough.

The new pool hall sits where the conservatory once stood, but it reads as deliberate architecture rather than an afterthought. The form is a pitched volume clad in vertical timber, with a standing-seam zinc roof that echoes the pitch of the original house without copying its character. The two buildings meet at a glazed link that keeps the junction honest: you can see exactly where one ends and the other begins.

The pool hall is fully glazed on two sides. Sliding doors open the space directly onto a generous terrace, dissolving the boundary between inside and out on a summer afternoon. Above, the structure is expressed — a series of exposed steel trusses carry the roof, which lifts to an apex with skylights. The room reads upward, not inward.

Inside, the materials do the work. The pool is lined in deep blue mosaic tile, set against a full-height Iroko feature wall that runs the length of the gable. The floor is herringbone limestone — warm underfoot, non-slip, and refined. Changing, shower and WC accommodation sits adjacent, finished with the same care: bright green tile, timber detailing, wall-hung fittings.

The steel trusses do two jobs at once: they carry the roof and they carry the rails for Emily’s hoist. The rails were colour-matched to the trusses so the two read as a single composed element rather than a piece of equipment bolted to a structure. The space never reads as adapted; it reads as designed.

The detail

Every room finished to the same standard.

The ancillary spaces — changing room, shower, WC — are not afterthoughts. They are part of the brief. A swim begins in a changing room and ends in a shower, and if those spaces feel institutional the spa atmosphere collapses the moment you step out of the water.

The changing corridor is tiled in bold green, with a herringbone limestone floor that continues from the pool hall. Joinery is terracotta — warm and deliberate. Wall-hung fittings keep the floor clear. The result is a sequence of spaces that build on each other: from the drama of the pool, through the character of the ancillary rooms, to the calm of the WC.

I managed every contractor who touched this building, from the structural engineers to the tilers. The standard was non-negotiable.

One of the happiest moments in my career was watching Emily use the pool for the first time.

To be involved in something that makes a genuine difference to someone’s quality of life — and to do it through the discipline of good design — is what this work is really for. The architecture served a human need. The photographs show a beautiful building. Both things are true, and neither is the whole story.

Discuss a project